ORIGINS: Wraith Storm: Difference between revisions

Line 309: Line 309:
fitting and calibration of the new USS REPUBLIC warp engines and
fitting and calibration of the new USS REPUBLIC warp engines and
core: a job he threw himself into. By the time Wraith was done with
core: a job he threw himself into. By the time Wraith was done with
Republic he had been promoted twice in rank and in the design team he was
REPUBLIC he had been promoted twice in rank and in the design team he was
now second in overall charge of the REPUBLIC build.  So far
now second in overall charge of the REPUBLIC build.  So far
simulations had showed that REPUBLIC was so tight that she was
simulations had showed that REPUBLIC was so tight that she was